Skip to content

Commissioning of pumps and pump units

Start-up and commissioning to the manufacturer's procedure with an official report. The warranty starts from commissioning rather than the date of sale.

In 80% of cases, pump units require repair because of installation errors

Pump installation requirements are demanding, and the cost of an error is loss of warranty coverage. That is why we commission equipment according to the manufacturer's strict procedure.

80 % of failures result from incorrect installation

Commissioning procedure

Every step is documented; this provides the basis for maintaining the warranty.

01 System inspection

Inspection of pipe connections, pump unit installation, protection systems and cable connections.

02 Alignment

For end-suction pumps, laser alignment with an official report is required.

03 Test run

Start-up with measurement of all required values, followed by a check of the automation system after the station starts.

04 Commissioning report

The service centre prepares an official commissioning report.

With correct installation and compliance with operating conditions, a pump or pumping station requires virtually no maintenance.

Self-commissioning or a service centre

The difference is not only in the quality of work: the commissioning method determines when the warranty begins and who pays to correct errors.

Criterion Self-commissioning By the holding company’s specialists
1. Warranty period From the date of sale From the date of commissioning
2. Verification of pump installation requirements Full inspection with a report identifying all deficiencies
3. Verification of cable connections In accordance with manufacturer requirements
4. Verification of variable-frequency drive settings Full inspection, software verification and adjustment to system operating parameters and pump characteristics
5. Commissioning errors and resulting faults Any error voids the pump warranty, and repair and diagnostics are chargeable The service centre resolves the issue at the manufacturer’s expense and the warranty remains valid
6. Pump alignment (for selected models) Approximate accuracy Laser alignment is included in the commissioning cost
7. Cost savings Low, with a high risk of errors; unjustified for expensive and complex pumps Full payback through a longer warranty period and eliminated risks

The table can be scrolled horizontally.

Who performs the work

Our group has qualified personnel and modern tools for correct commissioning of pumping equipment. The team works with all types of pumps and pumping units, using only quality spare parts and materials.

We guarantee timely work to high quality standards and advise on the further operation of the equipment.

If we assembled the unit — pump unit and pumping station manufacture — it is commissioned by the same team of specialists. After start-up, the equipment can be placed under contract service maintenance.

Request commissioning

Tell us about the equipment and installation schedule — we will arrange a site visit:

Installed a pump? Do not start it yourself

We will commission it to the manufacturer’s procedure and issue a report so the warranty starts from start-up.

General enquiries email info@pumptech.by
Managing director ab@pumptech.by
Enquiries phone +375 29 777 73 73